Refacing replaces everything you touch and see on a cabinet run while keeping the boxes in place. New doors and drawer fronts, matching veneer on the exposed box edges and end panels, new hinges, new drawer slides and new hardware. The layout does not change and the counters usually stay. It is the most cost-effective route to a different-looking kitchen that exists, and it is also the option most often sold to people it does not suit. Whether refacing is right comes down to the boxes. A cabinet box that is square, solidly built, undamaged by water and sized sensibly for how you use the kitchen refaces beautifully. Plenty of the cabinetry in the 1960s to 1980s housing around Loma Linda falls into that category, because the carcasses from that period were frequently built better than what replaced them. A box that has swollen under a leaking sink, that racks when you pull a drawer, or that is part of a layout you dislike is not worth refacing at any price. We open the cabinets, check the boxes and say which category yours are in before quoting, including when the answer means a smaller job for us or none at all.
The quote is priced by door and drawer count rather than by linear foot, because that is what actually determines the material and the labor. It covers doors, fronts, veneer, hinges, slides and handles, plus any box repair needed before the new faces go on. Interior shelving, soft-close upgrades and a new sink base can be added as separate lines. Refacing pairs naturally with new countertops, and doing both at once avoids handling the same run twice.

Door count and material set the price, since the boxes are already there.
Square, solid and correctly sized boxes reface well, damaged ones do not.
Replacing hinges and slides is what makes refaced cabinets feel new.
Proudly serving Loma Linda, Calimesa, Grand Terrace, Colton, Highland and Redlands for years.
Ten services, from a single tub-to-shower conversion through a full bathroom rebuild, plus the kitchen and surface work the same crew handles. A tub swap in an existing footprint and a remodel that relocates the drain sit at opposite ends of that list. Start with the one closest to your project.

Our service area covers Loma Linda plus Calimesa, Grand Terrace, Colton, Highland and Redlands. Those six cities sit inside a twenty minute drive of each other and share almost nothing administratively. The building department, the water provider, and any historic review all change at the city line, and each one moves the schedule.
Frequently Asked Questions
Bathroom Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
There is no single price for a bathroom remodel here. Cost follows whether fixtures move, whether the supply and waste lines behind the wall get replaced, how much of the floor comes up, and what the permit scope turns out to be. A refresh inside the existing footprint and a remodel that relocates the drain are not comparable jobs. We price after a walkthrough rather than before.
Ours covers the scope of work room by room, which walls and floors get opened, the fixtures and finishes selected, and the permit and inspection steps the project needs. It also names what we are deliberately leaving alone. That last part is what keeps a quote comparable to another one.
Ask who pulls the permit and which department it goes to, because the answer differs between Loma Linda, Colton, Highland, Redlands, Grand Terrace and Calimesa. Ask what happens if the waste line behind the wall is worse than expected. A contractor who has worked in your city recently will answer both without hesitating.
A great deal, as long as the drain stays where it is. Swapping a tub for a shower, changing the vanity and lighting, replacing the floor, and rebuilding the wet wall are all achievable inside a small footprint. The cost jumps when the layout moves, because that pulls plumbing and inspection into the job.
Schedule follows the permit and inspection sequence, whether fixtures move, and lead times on tile and glass. A single-scope refresh in an existing footprint and a full rebuild that relocates the drain run on very different calendars. We map the sequence for your address before demo so you know where the waiting happens.
Demolition, painting and hardware are reasonable to take on. Anything behind the wall or under the tile is not, because waterproofing failures show up two years later and plumbing changes are inspected. If you plan to do part of it, tell us at the walkthrough and we will scope around it.
It is priced by the number of doors and drawer fronts rather than by the length of the run, because that is what drives both material and labor. Material choice is the other variable. Refacing lands well below replacement in nearly every case where the boxes are sound.
It depends entirely on the boxes and the layout. Sound boxes in a layout that works are ideal candidates. Water-damaged boxes, or a layout you want changed, mean replacement is the better spend even though it costs more up front.
You need someone who will assess the boxes honestly first, because that is where the decision actually gets made. The refacing itself is finish carpentry. The judgement about whether your existing cabinetry deserves it is the part worth paying attention to.
Considerably less, and the kitchen stays largely usable throughout. There is no demolition of the boxes and no plumbing disconnection unless the sink base is being changed. The lead time on the doors themselves is usually the longest part of the process.
Reface Your Loma Linda Cabinets
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Bathroom Remodeling needs.

We had an original tub in a 1970s house off Barton Road that nobody in the family could step over safely anymore. They converted it to a curbless shower and were straight with us that the subfloor needed attention first rather than pretending it did not. The inspection passed the first time.
Denise R.

Our hall bathroom sat on slab and had never been touched since the house was built. Because we are close enough to San Timoteo Creek that moisture has always been a factor here, they spent real time on the waterproofing detail before any tile went down. The written scope told us exactly which walls were coming open and which were staying shut.
Marcus T.

I work shifts at Loma Linda University Health and asked them to replace the flooring through the bathroom and hallway. They talked me out of the more expensive option because the existing surface underneath did not need it. Quiet crew, clean site, and they finished on the day they said they would.
Priya S.
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.